At the PLN Makassar Gas turbine power station, we upgraded two (2) units idos HMI for Frame 6 Gas Turbine.  It is full function interface for the turbogenerator, including the operation, configuration, alarm/event record, data trending.

BACKGROUND. The DOS base Mark_V HMI has been obsoleted, it need to be upgraded or retrofitted in order to interface with the Mark V Control system.

Together with our partner, we provide you a proven, plug and play replacement of <i> machine at PLN Makassar. It built on the advanced VT SCADA platform, provide a complete function to monitor and operate the unit.

Following are some photos took on site.