Project: Turbine Protection System Retrofit
Year : 2018
Boiler Capacity : 2 x 10 MW
Scope Of Work : Retrofit to Turbine Protection Shutdown System (ESD Control), 2oo3 Overspeed Protection (OSP), Turbine Trip block & MSV Actuator
Location : PLTU Nii Tanasa, Sulawesi Tenggara, Indonesia