Project Gallery
TECG Control offers a range of power plants solutions tailored to different requirements.
Over the years, we have successfully completed several projects related to coal-fired boiler optimisation, generator excitation system upgrade as well as governor control modernization.
We are still constantly innovating and developing a better ways to provide greener energy solutions to the power plant.
Over the years, we have successfully completed several projects related to coal-fired boiler optimisation, generator excitation system upgrade as well as governor control modernization.
We are still constantly innovating and developing a better ways to provide greener energy solutions to the power plant.
Project Reference :
Coal Mill Air Flow Measurement at Jawa Tengah, Indonesia
FEGT Monitoring at Jawa Tengah, Indonesia
Portable FEGT Measurement at Jawa Barat, Indonesia
Boiler Tube Leakage Detection at Sulawesi Selatan, Indonesia
Boiler Tube Leakage Detection at Jawa Timur, Indonesia
Flue Gas Analyzer at Jawa Barat, Indonesia
Portable FEGT Measurement at Jawa Timur, Indonesia
FEGT Monitoring at Banten, Indonesia
Portable FEGT Measurement at Sumatera Utara, Indonesia
FEGT Monitoring at Jawa Barat, Indonesia
Vibration Monitoring/Analyzer at Sulawesi Selatan, Indonesia
FEGT Monitoring at Banten, Indonesia
Hydro Power Station Control Modernization at Jawa Timur
Turbine Protection System Retrofit at Sulawesi Tenggara
Motor AVR Control Replacement at Singapore
Hydro Power Station Control Modernization at Sumatera
Generator Excitation System Upgrade at Sumatera Utara
Instrument Control Supply & Installation
Governor Control Modernization at Sulawesi Selatan
Protection Relay Modernization Upgrade at Sumatera Utara
Replacement of machine HMI at Makassar