by tecgcontrol | Nov 16, 2021 | TECG Control News
At the PLN Makassar Gas turbine power station, we upgraded two (2) units idos HMI for Frame 6 Gas Turbine. It is full function interface for the turbogenerator, including the operation, configuration, alarm/event record, data trending. BACKGROUND. The DOS base Mark_V...
by tecgcontrol | Nov 16, 2021 | TECG Control News
In order to have the reliable turbine Safety Trip Protection System, we retrofitted the existing system from control to instrument, raise the safety, reliability to highest. Including: SIL-3 Safety PLC, Turbine 2oo3 Trip Block, 2oo3 Overspeed Protection System,...