by tecgcontrol | Feb 26, 2024
Air Flow Monitoring at Jawa Tengah, Indonesia Success Story Located in Central Java, Indonesia, PLTU Rembang (2 x 315 MW) has improved the Primary Air Flow Sensor for coal mills from previous measurements using other manufacturers. Previously, the Rembang PLTU...
by tecgcontrol | Feb 26, 2024
Boiler Tube Leakage Detection at Jawa Timur, Indonesia Project: Boiler Optimization – Boiler Tube Leakage Detection Year : 2022 Boiler Capacity : 660 MW Scope Of Work : Upgrade Sensor BTLD &...
by tecgcontrol | Feb 26, 2024
Generator Excitation System Upgrade at Sumatera Utara, Indonesia Project: Generator Excitation System Upgrade Year : 2018 Boiler Capacity : 2 x 115 MW Scope Of Work : Upgrade to Redundant Static Excitation System for 115MW Steam Turbine Generator (Rated field current...
by tecgcontrol | Feb 26, 2024
Governor Control Modernization at Sulawesi Selatan, Indonesia Project: Governor Control Modernization Year : 2018 Generator Capacity : 2 x 63 MW Scope Of Work : Governor Control (Redundant), Hydraulic servo control skid with manual backup control Location : PLTA...